Publicaciones

Affichage de 2611 à 2620 sur 5569


  • Communication dans un congrès

Comparative Evaluation? Yes, But With Which Alternative UI?

Hayet Hammami, Gaëlle Calvary, Meriem Riahi, Faouzi Moussa, Sarah Bouzit

User’s feedback provides valuable information suitable to help designers to improve their work. In this paper, we present a study on user’s feedback when evaluating a User Interface (UI) by comparison. Our aim is to define the properties that the alternative UI must satisfy to maximize the benefits...

Electronic Visualisation and the Arts (EVA 2017), Jul 2017, Sunderland, United Kingdom. pp.32:1-32:7, ⟨10.14236/ewic/HCI2017.105⟩. ⟨hal-03223718⟩

  • Communication dans un congrès

Towards the Layered Evaluation of Interactive Adaptive Systems using ELECTRE TRI Method

Amira Dhouib, Abdelwaheb Trabelsi, Christophe Kolski, Neji Mahmoud

The layered evaluation of interactive adaptive systems has to consider many evaluation methods. The best evaluation method to be used for individual layers depend on many parameters such as the evaluation criteria, the stage of the development cycle, and the characteristics of the layer under...

12th International Conference on Software Technologies - ICSOFT 2017, Jul 2017, Madrid, Spain. pp.163-170, ⟨10.5220/0006437901630170⟩. ⟨hal-03338499⟩

  • Rapport

Cap Qualité - Planification et Réalisation

Philippe Moreau, Véronique Landrain, Laurent Keirsbulck, Cécile Roselle, Jean-Dominique Guerin

[Rapport de recherche] Rapport intermédiaire LAMIH- Institut Carnot, Université de valenciennes et du Hainaut-Cambrésis. 2017. ⟨hal-03442560⟩

  • Rapport

L3300 : Validation des algorithmes de modulation du niveau d’automatisation

Chouki Sentouh, Mohamed Amir Benloucif, Jérôme Floris, Philippe Simon, Jean-Christophe Popieul

[Rapport de recherche] LAMIH, Valenciennes. 2017. ⟨hal-03423307⟩

  • Communication dans un congrès

Timetable Optimization during Railway Infrastructure Maintenance

Luis Diego Arenas Pimentel, Paola Pellegrini, Said Hanafi, Joaquin Rodriguez

Maintenance activities are necessary to maintain the functionality of the railway infrastructure. Commonly, timetables are elaborated by considering the infrastructure unavailability periods caused by the performance of maintenance activities. However, sometimes unplanned maintenance activities...

7th International Conference on Railway Operations Modelling and Analysis - Rail Lille, Apr 2017, Lille, France. 20p. ⟨hal-01470312⟩